We are nearly done with the plastering now, just a bit of the ensuite and the bedroom cupboard to go. The two front bedrooms are pretty much finished minus a cupboard door. Many of the lights and plug points are in situ now too. The plumbing has resumed progress and it feels like things are moving along nicely. Looks like I can go and buy some white emulsion to get the first watery coat on.
from the doorshower valve goes in
Lovely day again here if you kept in the sunshine. Had a good walk round the Botanics and visited the library too. Let’s keep fingers crossed it’s sunny over the weekend. x
The bungalow has been super busy again today, the plasterers have made it down the stairs and finished the ‘join’ to the hall really well and the bathroom has been skimmed too. The dormers have been undercoated outside and prepped inside. The frame is in for the ensuite door and there is a wall between the new ensuite and the bedroom cupboard. Electrical stuff has been going on too. That’s quite a lot if you ask me.
the windows workjoin between hall and stair
Other Stuff
The sun has been shining all afternoon and, though it is a bit chilly out of the rays, I have removed the guinea hutch from its winter home to allow the summer-house to be used again. I emptied it, swept out all the hay and debris, put the furniture back in and within 5 minutes my boys and their pal had taken up residence. Typical. It was good to see them outside playing for hours on end I must admit, about time too. This could be spring coming back to cheer us all up a bit. The boys insisted on eating their tea in the summer-house, brilliant, you can tell they’re desperate for good weather too.
mid regeneration of summer houselooking betteroccupied by a boyeven Candy and Lillie were out today.
Look at me now, all full of flower and flopping everywhere. Not long after I took this one of the flower stalks gave up and came off. The perfume had got a bit much if I’m honest.
Week 6 joining in with Lou’s Nature in the Home at little green shed.