So here we are at day twenty. We have another dormer on the horizon and some insulation being installed between the uprights. The bath no longer floods the void under the house when it is emptied so it’s all good. Did wonder if the roofers would be here today after a wet weekend. Glad they managed to get on. Here are today’s pics for you.
back dormer under constructioninsulation starts filling in the uprights
Four weeks done and boy can you see a difference. Here are the highlights today:-
The back dormer has been prepped and the back section where the alarm was holding everything up is all sorted.
Loads of slates have been taken off at the back ready for the dormer to go in.
Still more invisible electrical work and plumbing done. Some not so invisible like the 6 holes with wire tentacles coming out of them in the new bathroom.
We have bath taps, the children are looking forward to having a bath in a bedroom, as they see it.
The space where the stair used to be is nowhere to be seen any more.
There was another huge load of insulation on the drive today along with other bits and bobs. The upstairs seems to be shrinking at the moment.
Have a look for yourself.
Lennie surveying his patchsmall room’s window has gonefront to back todayto front window todayinsulation making its own way upstairs
The Dogs – being photogenic
Lucy mid stretchLennie looking out for squirrels
I’m very excited about going out for tea with a pal of mine for dosa masala, a fantastic Southern Indian dish which has a gram flour pancake filled with spicy potatoes and is served with 2 or 3 different sauces (for want of another word). I acquired a serious taste for dosa when I lived in Malaysia. Well worth braving the cold for.
Well, this is how it started upstairs today. Where’s the fabulous blue sky gone?
outside early afternooninside mid afternoon – roof onoutside at the end of works today
The new bathroom has started to arrive…
now, how does it all fit in the bathroom?
Mark and I spent half an hour today trying to work out how exactly the pieces will fit in the jigsaw of the bathroom. Think we’re nearly there. Tricky to imagine it with tiles and a proper floor.
banging the old drainage pipes off the wall.
We needed some work done outside for the bathroom drainage. Mark had a rare time hacking and burning the old pipe off. My jasmine will never be the same but never mind. We just won’t mention exactly how the broadband went down for a while. Lucky the electrician happened to pop in just at the right moment or I wouldn’t be able to post today. Perfect timing.
Here’s a wee picture of our first daffodil to cheer you up, spring is coming, for sure.