Day Fifty-One

We have lots more lights, a bath panel, latches on the cupboards and a free draining bath today along with more skirting and plywood on the upstairs bathroom floor.  The door to the ensuite has also been installed which looks good, despite the plaster still drying.

two doors
two doors

That’s it today, got a poorly F who’s been sleeping all day at home with his Dad.  I’m hoping he’s a bit better tomorrow after a good night’s sleep – it’s horrible when they’re ill.

4 thoughts on “Day Fifty-One

  1. Hope f feels better soon. Love the doors at the en suite what a difference from when it was just knocked through k x

  2. Poor F man, his uncle is prepped ready to look after tomorrow ! Can’t wait to see the eng- suite downstairs

Leave a reply to Bungalow Blogger Cancel reply